会员登陆 账号: 密码:
Hubei Muzhijun Engineering Material Co., Ltd.
CONTACT   US
Add: Gongqinggang Road, Wuhangang Industrial Park, E’zhou Economic Development Zone, Hubei Province, China Contact:
Manager Li: +86-18971993755 
Manager Feng: +86-13329975177
Manager Du: +86-18671119336
Fax: +86-711-3611588
URL: www.hbmzj.com  
Project cases

Lan-xin railway

Lan-xin railway is the only railway transport artery led to mainland China. The total length is 1776km. In the construction of this line, our resin caulk compound is widely used and it is highly praised.

Lan-xin railway second line

< Back >